Home/Video Gallery
See the work in motion.
Fabrication, panelization, on-site erection, and finished builds. We are adding footage section by section, so check back as the gallery fills in.
01 · Fabrication & Roll-Forming
Master coil to finished profile.
Coming soonRoll-forming line
Coming soonCoil to profile
Coming soonShop fabrication
02 · Panelization
Walls, floors, and roofs built in the shop.
Holiday Inn, Glendale · panelized LGS hotel (with ABS)
Senior housing, Northridge · panelized LGS (with ABS)
Coming soonPanel line
03 · Erection & Framing
Raised on your site.
Volumetric modules craned and set · LGS volumetric
Coming soonOn-site framing
Coming soonField erection
04 · Aerial & Finished Builds
Drone flyovers and completed homes.
Coming soonDrone jobsite flyover
Coming soonAerial site progress
Coming soonFinished LGS home
Have a project?
